Lead Paint Risk in Uriah, AL
13.4%Pre-1978 Housing
19Pre-1978 Units
142Total Housing Units
LowRisk Level
How to Interpret This
This is an area-level estimate based on Census housing-age data for Uriah. It does not prove whether a specific home contains lead paint. If a home was built before 1978, certified lead inspection/testing is the reliable next step before renovation or when young children may be exposed.
How Uriah Compares
What This Means for Uriah Residents
Most housing in Uriah was built after 1978 (86.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Uriah
Get a more detailed risk assessment for a specific address.