Lead Paint Risk in Mill Bay, AK

9.5%Pre-1978 Housing
150Pre-1978 Units
1,582Total Housing Units
LowRisk Level

How to Interpret This

This is an area-level estimate based on Census housing-age data for Mill Bay. It does not prove whether a specific home contains lead paint. If a home was built before 1978, certified lead inspection/testing is the reliable next step before renovation or when young children may be exposed.

How Mill Bay Compares

Mill Bay
9.5%!<(MISSING)/span>
Alaska
37.3%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Mill Bay Residents

Most housing in Mill Bay was built after 1978 (90.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Mill Bay

Get a more detailed risk assessment for a specific address.