Lead Paint Risk in Marana, AZ
4.0%Pre-1978 Housing
894Pre-1978 Units
22,368Total Housing Units
LowRisk Level
How to Interpret This
This is an area-level estimate based on Census housing-age data for Marana. It does not prove whether a specific home contains lead paint. If a home was built before 1978, certified lead inspection/testing is the reliable next step before renovation or when young children may be exposed.
How Marana Compares
What This Means for Marana Residents
Most housing in Marana was built after 1978 (96.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Marana
Get a more detailed risk assessment for a specific address.