Lead Paint Risk in Mescal, AZ

9.9%Pre-1978 Housing
77Pre-1978 Units
774Total Housing Units
LowRisk Level

How to Interpret This

This is an area-level estimate based on Census housing-age data for Mescal. It does not prove whether a specific home contains lead paint. If a home was built before 1978, certified lead inspection/testing is the reliable next step before renovation or when young children may be exposed.

How Mescal Compares

Mescal
9.9%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Mescal Residents

Most housing in Mescal was built after 1978 (90.1% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Mescal

Get a more detailed risk assessment for a specific address.