Lead Paint Risk in Castle Pines, CO
3.7%Pre-1978 Housing
172Pre-1978 Units
4,628Total Housing Units
LowRisk Level
How to Interpret This
This is an area-level estimate based on Census housing-age data for Castle Pines. It does not prove whether a specific home contains lead paint. If a home was built before 1978, certified lead inspection/testing is the reliable next step before renovation or when young children may be exposed.
How Castle Pines Compares
What This Means for Castle Pines Residents
Most housing in Castle Pines was built after 1978 (96.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Castle Pines
Get a more detailed risk assessment for a specific address.