Lead Paint Risk in Pelican Marsh, FL
0.6%Pre-1978 Housing
13Pre-1978 Units
2,178Total Housing Units
LowRisk Level
How to Interpret This
This is an area-level estimate based on Census housing-age data for Pelican Marsh. It does not prove whether a specific home contains lead paint. If a home was built before 1978, certified lead inspection/testing is the reliable next step before renovation or when young children may be exposed.
How Pelican Marsh Compares
What This Means for Pelican Marsh Residents
Most housing in Pelican Marsh was built after 1978 (99.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Pelican Marsh
Get a more detailed risk assessment for a specific address.