Lead Paint Risk in Shiloh, IL

16.7%Pre-1978 Housing
950Pre-1978 Units
5,687Total Housing Units
LowRisk Level

How to Interpret This

This is an area-level estimate based on Census housing-age data for Shiloh. It does not prove whether a specific home contains lead paint. If a home was built before 1978, certified lead inspection/testing is the reliable next step before renovation or when young children may be exposed.

How Shiloh Compares

Shiloh
16.7%!<(MISSING)/span>
Illinois
64.1%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Shiloh Residents

Most housing in Shiloh was built after 1978 (83.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Shiloh

Get a more detailed risk assessment for a specific address.