Lead Paint Risk in Melcher-Dallas, IA

84.6%Pre-1978 Housing
444Pre-1978 Units
525Total Housing Units
HighRisk Level

How to Interpret This

This is an area-level estimate based on Census housing-age data for Melcher-Dallas. It does not prove whether a specific home contains lead paint. If a home was built before 1978, certified lead inspection/testing is the reliable next step before renovation or when young children may be exposed.

How Melcher-Dallas Compares

Melcher-Dallas
84.6%!<(MISSING)/span>
Iowa
62.4%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Melcher-Dallas Residents

Melcher-Dallas has a high concentration of pre-1978 housing (84.6%). Most homes in this area predate the federal lead paint ban. If you live in an older home, a professional lead paint inspection is strongly recommended — especially if young children are present.

Check a Specific Address in Melcher-Dallas

Get a more detailed risk assessment for a specific address.