Lead Paint Risk in Ponderosa Pines, MT

2.3%Pre-1978 Housing
8Pre-1978 Units
343Total Housing Units
LowRisk Level

How to Interpret This

This is an area-level estimate based on Census housing-age data for Ponderosa Pines. It does not prove whether a specific home contains lead paint. If a home was built before 1978, certified lead inspection/testing is the reliable next step before renovation or when young children may be exposed.

How Ponderosa Pines Compares

Ponderosa Pines
2.3%!<(MISSING)/span>
Montana
49.8%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Ponderosa Pines Residents

Most housing in Ponderosa Pines was built after 1978 (97.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Ponderosa Pines

Get a more detailed risk assessment for a specific address.