Lead Paint Risk in Chalco, NE
18.1%Pre-1978 Housing
790Pre-1978 Units
4,359Total Housing Units
LowRisk Level
How to Interpret This
This is an area-level estimate based on Census housing-age data for Chalco. It does not prove whether a specific home contains lead paint. If a home was built before 1978, certified lead inspection/testing is the reliable next step before renovation or when young children may be exposed.
How Chalco Compares
What This Means for Chalco Residents
Most housing in Chalco was built after 1978 (81.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Chalco
Get a more detailed risk assessment for a specific address.