Lead Paint Riskby the decade your home was built
Home / States / Ohio / Cleveland
Cleveland, Ohio

Lead paint risk in Cleveland, OH

59of every 100 homes in Cleveland likely have lead-based paint somewhere

That's about 118,000 of Cleveland's 201,141 homes. 70% of them are homes that were built before 1940 (49% of all its homes; HUD found lead paint in 85% of homes that age). That's more than the U.S. as a whole (26 in 100).

201,141homes (Census estimate)
85%built before 1980
(the Census can't split at 1978)
49%built before 1940
~52in 100 likely have a lead hazard now: failing lead paint, lead dust or soil
100 homes in Cleveland, oldest first
pre-19401940s1950s1960s1970s1980 and lateroutline = likely no lead paint
Each square is one home in a hundred, coloured by the decade it was built. Solid squares are the homes HUD's rates say are likely to have lead paint; outlines are likely free of it.
Every home, by decade built, to scale
1939 or earlier: 97,668 homes (48.6%)1939 or earlier: about 83,408 likely with lead paint1940s: 21,262 homes (10.6%)1940s: about 12,970 likely with lead paint1950s: 24,198 homes (12.0%)1950s: about 14,761 likely with lead paint1960s: 16,539 homes (8.2%)1960s: about 3,903 likely with lead paint1970s: 11,427 homes (5.7%)1970s: about 2,245 likely with lead paint1980s: 6,330 homes (3.1%)1980s: about 242 likely with lead paint1990s: 5,736 homes (2.9%)1990s: about 219 likely with lead paint2000s: 7,834 homes (3.9%)2000s: about 299 likely with lead paint2010s: 8,013 homes (4.0%)2010s: about 306 likely with lead paint2020 or later: 2,134 homes (1.1%)2020 or later: about 82 likely with lead paintpre-194049%1950s12%
Width is the share of homes built in each decade, oldest on the left. Inside each decade, the solid part is the share likely to have lead paint: nearly all of the pre-1940 block, about a quarter of the 1960s, almost none after 1980.
When was your home built?

The neighbourhood number is a mix. Your own home's odds depend on its own decade. Pick it:

How to find out for sure →

How it compares
AreaLead paint, per 100Built before 1980Before 1940Homes by decade, oldest first
Cleveland5985%49%
Ohio3563%19%
United States2650%12%

Neighbourhoods inside Cleveland can differ a lot. Check an address:

What to do with this

If your home was built before 1978

  1. Find out the year it was built. Your county assessor’s record or a listing usually has it. Homes built before 1960 are where the odds are highest.
  2. Look for the triggers, not the paint. Peeling or chalking paint, windows that stick and rub, worn painted floors and porches, and bare soil next to the house.
  3. Before you renovate, test. A certified inspector can tell you where lead paint is; a risk assessor can tell you where the hazards are. Hire an EPA- or state-certified renovator for paid work. How testing works →
  4. If a child under 6 lives there or visits often, ask their doctor about a blood lead test. That’s how you find out whether a child has been exposed.
Guides