Lead Paint Risk in Merlin, OR

19.2%Pre-1978 Housing
114Pre-1978 Units
595Total Housing Units
LowRisk Level

How to Interpret This

This is an area-level estimate based on Census housing-age data for Merlin. It does not prove whether a specific home contains lead paint. If a home was built before 1978, certified lead inspection/testing is the reliable next step before renovation or when young children may be exposed.

How Merlin Compares

Merlin
19.2%!<(MISSING)/span>
Oregon
49.7%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Merlin Residents

Most housing in Merlin was built after 1978 (80.8% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Merlin

Get a more detailed risk assessment for a specific address.