Lead Paint Risk in Laurys Station, PA
13.2%Pre-1978 Housing
40Pre-1978 Units
303Total Housing Units
LowRisk Level
How to Interpret This
This is an area-level estimate based on Census housing-age data for Laurys Station. It does not prove whether a specific home contains lead paint. If a home was built before 1978, certified lead inspection/testing is the reliable next step before renovation or when young children may be exposed.
How Laurys Station Compares
What This Means for Laurys Station Residents
Most housing in Laurys Station was built after 1978 (86.8% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Laurys Station
Get a more detailed risk assessment for a specific address.