Lead Paint Risk in Woodland Hills, UT

7.5%Pre-1978 Housing
30Pre-1978 Units
398Total Housing Units
LowRisk Level

How to Interpret This

This is an area-level estimate based on Census housing-age data for Woodland Hills. It does not prove whether a specific home contains lead paint. If a home was built before 1978, certified lead inspection/testing is the reliable next step before renovation or when young children may be exposed.

How Woodland Hills Compares

Woodland Hills
7.5%!<(MISSING)/span>
Utah
36.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Woodland Hills Residents

Most housing in Woodland Hills was built after 1978 (92.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Woodland Hills

Get a more detailed risk assessment for a specific address.