Lead Paint Risk in Larch Way, WA
11.2%Pre-1978 Housing
187Pre-1978 Units
1,670Total Housing Units
LowRisk Level
How to Interpret This
This is an area-level estimate based on Census housing-age data for Larch Way. It does not prove whether a specific home contains lead paint. If a home was built before 1978, certified lead inspection/testing is the reliable next step before renovation or when young children may be exposed.
How Larch Way Compares
What This Means for Larch Way Residents
Most housing in Larch Way was built after 1978 (88.8% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Larch Way
Get a more detailed risk assessment for a specific address.